User Information
Climbing formwork 150F
Anchoring on the structure
21
999775002 - 02/2020
Check of the positioning point
➤
Before pouring, check all positioning points and sus-
pension points again.
Pouring
➤
Prevent the vibrator from touching the stop anchors.
➤
Do not place concrete from directly above the stop
anchors.
These measures prevent the anchors from working
loose during pouring and vibration.
Stripping the formwork
Remove the connecting parts holding the positioning
point to the formwork either before or after stripping,
depending on which connecting parts are used.
Positioning point with Positioning cone 15.0 5cm:
➤
Remove the Super plate 15.0 before stripping the
formwork.
➤
Unscrew the Tie rod 15.0.
▪
The sealing sleeve must be completely
pushed onto the positioning cone.
▪
Always screw in components until they are
fully engaged. When correctly fitted, there
will still be 10 mm of thread visible
between the part and the depth mark on
the stop anchor or pigtail anchor.
▪
Tolerance for locating the positioning
points and suspension points: ±10
mm
in
the horizontal and the vertical.
a ... 10
mm
b ... 10
mm
▪
The axis of the positioning cone must be at
right-angles to the surface of the concrete
– maximum angle of deviation 2°.
α
... max. 2°
▪
The positioning cone must be embedded
so that it is flush with the concrete surface.
c ... > 0
mm not permitted
9775-269-08
b
a
a
9775-269-07
c
9775-269-12
c
9775-269-13
Mark the positions of the anchoring points at
the top edge of the formwork to make them
easier to locate when the concrete is being
poured.
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...