User Information
Climbing formwork 150F
Operating the climbing formwork
37
999775002 - 02/2020
2nd casting section
Hanging the working platform into place on the
suspension points:
➤
Prepare the suspension points.
➤
Raise the prepared working platform with the crane
lifting tackle and hook it into the suspension points.
➤
Secure the working platform with fastening pins.
➤
Tighten the fixing-nuts of the climbing cones using a
Reversible ratchet 1/2" and Box spanner 41.
Wind bracing (if necessary):
➤
Attach a Wind bracing MF/150F/K
6.00m to the
Climbing bracket 150
F
with
a
d25/151
head
bolt
and
a linch pin.
➤
Fasten the tensioning unit of the Wind bracing
MF/150F/K 6.00m to the structure, i.e. to the posi-
tioning point prepared with a climbing cone.
➤
Tighten the Wind bracing MF/150F/K 6.00m.
Formwork:
➤
Attach the crane lifting tackle to the lifting brackets
on the pre-assembled formwork.
➤
Crane-lift the formwork to the working platform.
The fastening pin must be pointing vertically
downward!
9775-260-01
9775-230-02
A
Stop anchor 15.0
B
Climbing cone 15.0 5cm
C
Wind bracing MF/150F/K
6.00m
Wind bracing MF/150F/K
6.00m
Permitted tensile force: 25 kN
Wind bracing MF
6.00m
Permitted tensile force: 15 kN
9775-241-02
A
B
C
9775-221-01
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...