46
999775002 - 02/2020
Assembly
User Information
Climbing formwork 150F
➤
Lower the pre-assembled unit onto the Climbing
bracket by crane.
On the side nearest the railings:
➤
Bolt the scissor-action spindle to the rear connector
plate of the Climbing bracket with a D25/120 head
bolt and secure this with a Spring cotter 5mm.
On the side nearest the formwork:
1)
Fix a D25/120 head bolt in the Vertical waling and
secure it with a Spring cotter 5mm.
2)
Knock the fixing-wedge into place.
This fixes the Vertical waling to the Climbing
bracket.
➤
Detach the lifting chain from the Vertical waling.
Fitting the bracing
➤
Move both Vertical walings 3.00m into the same
position by turning the screwjack mechanism on the
scissor-action spindles.
➤
Attach bracing (scaffolding tubes).
Distance between screw-on coupler and swivel cou-
pler: max. 160
mm.
Tightening torque of the couplers for the bracing tubes:
50
Nm
CAUTION
➤
Do not detach the lifting chain from the Ver-
tical waling until the unit has been properly
connected to the Climbing bracket as
described below.
9775-211-01
9775-211-03
D
Scaffold tube 48.3mm
E
Screw-on coupler 48mm 50
F
Swivel coupler 48mm
9775-211-04
1
2
9775-210-01
D
E
F
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...