Laying the ProFrame panels on the beams from
above
➤
Lay the ProFrame panels at right angles to the sec-
ondary beams.
a ... spacing of props
➤
Spray the ProFrame panels with parting agent.
Pouring
To protect the surface of the form-facing, we recom-
mend using a vibrator with a protective rubber cap.
☞
➤
Local regulations, or the result of a hazard
assessment carried out by the erector, may
make it necessary to use personal fall arrest
systems (PFAS) when setting-up the form-
work from above.
a
a
a
98039-210-01
Where necessary (e.g. edge zones), secure the
form-ply with nails.
Recommended nail lengths
▪
sheet thickness 21
mm - approx. 50
mm
▪
sheet thickness 27
mm - approx. 60
mm
☞
Windproofing
▪
For increased stability, in larger rooms, the
full erection sequence of "primary beams +
secondary beams + formwork sheets"
should be carried out progressively for suc-
cessive sub-areas of the room.
When doing this, provide suitable bracing to
walls or columns.
▪
If there is any risk of the formwork being
blown over, all free-standing, non-enclosed
areas of slab formwork must be secured dur-
ing work-breaks and when work finishes for
the day.