User Information
Dokaflex
30
tec
35
999803902 - 06/2014
Drop-beam integrated into the floor-slab
Secondary beams parallel to drop-
beam
All the data below apply where 3-SO
21
mm
and
3-SO
27
mm formwork sheets are used.
Drop beams of between 10 and 30
cm
in
height
b ... max. 100
cm
l ... max. 150
cm
Base formwork
▪
Height of squared timber = 30-h (cm)
Sidewall formwork:
▪
Doka beam H20 top
▪
Squared timber 10/8 cm
Drop beams of between 30 and 47
cm
in
height
b ... max. 100
cm
l ... max. 150
cm
Sidewall formwork:
▪
Doka beam H20 top
▪
Squared timber 4/8
cm for drop beams of between
30 and 34
cm in height
▪
Squared timber 8/8
cm for drop beams of between
34 and 47
cm in height
Drop beams of between 47 and 60
cm
in
height
b ... max. 100
cm
l ... max. 150
cm
Sidewall formwork:
▪
2 Doka beams H20 top
Drop beams of between 60 and 70
cm
in
height
b ... max. 100
cm
l ... max. 150
cm
Sidewall formwork:
▪
2 Doka beams H20 top
▪
Height of squared timber = h-60 (cm)
Slab
thickness d
Spacing of
secondary beams
Position of Beam
forming support
20 cm
30 cm
62.5 cm
41.7 cm
On every 2nd secondary beam
On every 3rd secondary beam
Slab
thickness d
Spacing of
secondary beams
Position of Beam
forming support
20 cm
30 cm
41.7 cm
33.3 cm
On every 2nd secondary beam
On every 2nd secondary beam
9720-253-01
h
d
b
l
9720-254-01
h
d
b
l
Slab
thickness d
Spacing of
secondary beams
Position of Beam
forming support
20 cm
30 cm
31.25 cm
25.00 cm
On every 2nd secondary beam
On every 2nd secondary beam
Slab
thickness d
Spacing of
secondary beams
Position of Beam
forming support
20 cm
30 cm
40.0 cm
-
On every secondary beam
-
9720-255-01
h
d
b
l
9720-256-01
h
d
b
l