User Information
Framed formwork Framax Xlife plus
Wall formwork
11
999811202 - 04/2019
➤
Detach the pouring platform from the crane.
➤
Continue lining up further gang-forms in this way,
and link them together (see the section headed
'Inter-panel connections').
➤
Fit end-of-platform sideguards (see the section
headed 'Pouring platforms').
Erecting the opposing formwork:
Once the reinforcement has been placed, the form-
work can be closed.
➤
Mount the opposing guard-rail to the (laid-flat) gang-
form of the opposing formwork (see 'Opposing
guard-rails').
➤
Spray the formwork sheet with release agent (see
'Cleaning and care').
➤
Lift the opposing formwork by crane to its next loca-
tion.
➤
Fit the form ties (see 'Tie-rod system').
➤
Detach the gang-form from the crane (wherever pos-
sible, operate the lifting hook from the opposite pour-
ing platform).
➤
Continue lining up further gang-forms in this way,
and link them together (see 'Inter-panel connec-
tions').
Pouring
Observe the following
guidelines
:
▪
The section headed 'Pressure of fresh concrete on
vertical formwork – DIN 18218' in the Calculation
Guide 'Doka formwork engineering'
▪
DIN 4235 Part 2 - 'Compacting of concrete by vibrat-
ing'
➤
Pour the concrete.
WARNING
There is not yet an opposing guard-rail on the
formwork!
Danger to life from fatal falls!
➤
Either use personal protective equipment to
protect against falls (e.g. Doka personal fall-
arrest set)
or
mount an opposing guard-rail to the gang-
form while this is still being pre-assembled in
a flat position.
98112-228-01
Before disconnecting from the crane:
➤
If there are no panel struts on the opposing
formwork, do not disconnect the element
from the crane until a large enough number
of form ties have been installed to keep it
safely in the upright.
Permitted fresh-concrete pressure:
80 kN/m
2
NOTICE
➤
Do not exceed the maximum permissible
rate of placing.
98112-228-02
Summary of Contents for Framed formwork Framax Xlife plus
Page 2: ...2 999811202 04 2019 User Information Framed formwork Framax Xlife plus ...
Page 51: ...User Information Framed formwork Framax Xlife plus Wall formwork 51 999811202 04 2019 ...
Page 70: ...70 999811202 04 2019 Wall formwork User Information Framed formwork Framax Xlife plus ...
Page 117: ...User Information Framed formwork Framax Xlife plus Wall formwork 117 999811202 04 2019 ...
Page 127: ...User Information Framed formwork Framax Xlife plus General remarks 127 999811202 04 2019 ...
Page 139: ...User Information Framed formwork Framax Xlife plus Component overview 139 999811202 04 2019 ...