User Information
Framed formwork Framax Xlife plus
Wall formwork
97
999811202 - 04/2019
Possible ways of fixing to horizontally placed pan-
els
Sideguards on exposed platform-
ends
On pouring platforms that do not completely encircle
the structure, suitable sideguards must be placed
across exposed end-of-platform zones.
Edge protection system XP
Assembly:
➤
Fasten Railing clamps XP onto the decking of the
pouring platform, by tightening the wedge (clamping
range 2 to 43 cm).
➤
Working from below, push a Toeboard
holder
XP
1.20m onto the Handrail post XP 1.20m.
➤
Push the Handrail post XP 1.20m into the post-hold-
ing fixture on the Railing clamps XP until the locking
mechanism engages.
➤
Fix guard-rail boards to the handrail post plates with
nails (diam. 5
mm).
Handrail clamp S
In the cross profile
Anti-liftout guard
A
Framax bracket 90
B
Spring cotter
C
Wedge bolt RA 7.5
98112-219-03
9727-209-01
B
C
A
A
Guard-rail board min. 15x3 cm (site-provided)
B
Handrail post XP 1.20m
C
Railing clamp
XP
40cm
D
Toeboard holder XP 1.20m
E
Pouring platform
Follow the directions in the “Handrail clamp
S”
User information!
98112-220-01
A
B
C
D
E
Summary of Contents for Framed formwork Framax Xlife plus
Page 2: ...2 999811202 04 2019 User Information Framed formwork Framax Xlife plus ...
Page 51: ...User Information Framed formwork Framax Xlife plus Wall formwork 51 999811202 04 2019 ...
Page 70: ...70 999811202 04 2019 Wall formwork User Information Framed formwork Framax Xlife plus ...
Page 117: ...User Information Framed formwork Framax Xlife plus Wall formwork 117 999811202 04 2019 ...
Page 127: ...User Information Framed formwork Framax Xlife plus General remarks 127 999811202 04 2019 ...
Page 139: ...User Information Framed formwork Framax Xlife plus Component overview 139 999811202 04 2019 ...