102
999805802 - 03/2016
Dismantling
Original Operating Instructions
Platform SCP
Working platform with no base beams
(suspended platform)
Platforms that are suspended from the girder grille
must be temporarily supported when being dis-
mounted.
Ways of supporting the platforms:
▪
project-specific bracket
▪
recess for Doka beams H20
▪
recess for latches
➤
Dismount the suspension profiles between the girder
grille and the supported platforms.
CAUTION
➤
The supports for the platforms must be
checked by the structural designer!
The formwork is set down on these platforms
later in the disassembly procedure.
▪
The tie-holes in the concrete can be helpful
for supporting the platforms.
☞
Important note:
➤
Take into account the loads imposed by the
formwork.
A
Supports for platforms
98058-416-26
A
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...