Assembling the working platform
Positioning the lower Distance profile
➤
Attach the crane suspension tackle to the lower dis-
tance profile.
➤
Set down the distance profile centred on the Sup-
ports SCP.
➤
Use a hexagon bolt to connect the distance profile
and the support.
➤
Detach the crane suspension tackle from the dis-
tance profile.
➤
Additionally secure each Support SCP to the dis-
tance profile with 2 chains.
Erecting the main working platforms
➤
Set down the working platform centred on the Sup-
ports SCP.
➤
Use a hexagon bolt to connect the distance profile
and the support.
➤
Additionally secure each Support SCP to the dis-
tance profile with 2 chains.
➤
Adjust the latch rolls.
F
Support SCP
G
Lower distance profile support SCP .....mm (project-specific)
F
Support SCP
G
Lower distance profile support SCP .....mm (project-specific)
The Supports SCP are crane-lifted together
with the distance profiles.
98058-465-01
F
G
98058-465-04
F
G
F
Support SCP
G
Lower distance profile support SCP .....mm (project-specific)
B
Platform with two Upper base beams
98058-465-03
F
G
98058-479-01
B
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...