122
999805802 - 03/2016
Anchoring on the structure - Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Anchoring on the structure - Lifting unit attached on one side
Anchoring on the structure with 2
Climbing cones SCP 20.0
Positioning point and suspension
point
▪
Climbing cone SCP 20.0
- The positioning point and the suspension point
are prepared using the Climbing cone
SCP
20.0.
▪
Stop anchor 20.0
- Expendable anchoring component for anchoring
the Climbing cone SCP (and thus the climbing
unit) in the concrete from one side.
▪
Cone screw M36 SW50 9cm
- At the positioning point – for fastening the Climb-
ing cone SCP.
- At the suspension point – for safe fixing of the
Bracket SCP suspension shoe, and thus of the
whole climbing unit.
▪
Bracket SCP suspension shoe
- Is anchored to the structure and is used for load
transfer.
- The suspension shoe is not rigidly connected to
the Bracket SCP. This facilitates the jobs of
installation on and removal from the structure.
Stop anchor 20.0 17.5cm 90
Note:
In the project planning stage and later,
avoid mixing
different types of stop anchor
to exclude the risk of
confusion on the jobsite.
a ... Tie-rod length: 17.5
cm
b ... Installation depth: 31.5
cm
c ... Minimum wall thickness: 33.5
cm (where the concrete cover is
2 cm)
c ... Minimum wall thickness: 34.5
cm (where the concrete cover is
3 cm)
d ... Concrete cover
e ... Size of stop-anchor plate: 90
mm
☞
Important note:
Use only the
Tie rod system 20.0
with Doka
automatic climbing formwork.
Risk of confusion!
➤
If Doka automatic climbing formwork is being
used jointly with other Doka climbing sys-
tems, then the Tie rod system 20.0 must be
used throughout the entire project.
A
Climbing cone SCP 20.0
B
Sealing sleeve SCP 20.0 (expendable anchoring component)
C
Stop anchor 20.0 17.5cm 90 (expendable anchoring component)
D
Depth mark
E
Cone screw M36 SW50 9cm
F
Bracket SCP suspension shoe
98058-453-01
F
A
B
D
C
E
WARNING
➤
If other stop-anchor lengths and plate sizes
are used, then revised structural analysis is
required and extra reinforcement steel must
be placed where necessary.
➤
It is forbidden to use Stop anchors 20.0 with
a plate size of 55
mm and a stop-anchor
length of < 30.5
cm in conjunction with
Climbing cones SCP 20.0.
➤
It is forbidden to use the Stop anchor 20.0
11.5cm 90.
98058-490-01
a
b
d
c
e
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...