Original Operating Instructions
Platform SCP
Anchoring on the structure - Lifting unit attached on one side
133
999805802 - 03/2016
Preparing the positioning point
a ... 400
mm (± 3mm)
b ... 400
mm (± 1mm)
WARNING
➤
Always screw the stop anchor into the uni-
versal climbing cone until it fully engages (up
to the depth mark).
Not screwing the stop anchor sufficiently far
into the cone may subsequently lead to
reduced load-bearing capacity and to the
failure of the suspension point – resulting in
injury and damage.
➤
Use only the Cone screw B 7cm for the posi-
tioning point and suspension point (head of
screw is
red
)!
WARNING
Sensitive rod steel!
➤
Never weld or heat tie rods.
➤
Tie rods that are damaged or have been
weakened by corrosion or wear must be
withdrawn from use.
☞
▪
The axis of the universal climbing cone must
be at right-angles to the surface of the con-
crete – maximum angle of deviation: 2°.
▪
The universal climbing cone must be embed-
ded so that it is flush with the concrete sur-
face.
▪
Tolerance for locating a group of positioning
points or suspension points: ±10
mm in the
horizontal and the vertical.
▪
The positioning points of a Suspension shoe
must be mounted at the same height – with
max. 2° deviation from the horizontal.
▪
Universal climbing cones are supplied with
Sealing sleeves K.
Every time
the cones are
re-used
, fit them with
new sealing sleeves
first.
98058-475-01
a
b
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...