134
999805802 - 03/2016
Anchoring on the structure - Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Positioning point with Cone screw B 7cm (with
hole drilled through form-ply)
Installation:
➤
Drill diam. 46
mm holes in the form-ply (position as
shown in shop drawing / assembly plan).
➤
Fit on a Form-ply protector 32mm.
Possible thicknesses of form-ply: 18 - 27 mm
➤
Push the sealing sleeve all the way onto the Univer-
sal climbing cone.
➤
Screw the stop anchor into the universal climbing
cone, until it engages (up to the depth mark).
➤
Push the Cone screw B 7cm through the form-facing,
screw it into the Universal climbing cone and tighten
it firmly.
Tools needed:
▪
Centre drill-bit diam. 46
mm
▪
Reversible ratchet 3/4"
▪
Spanner for Universal climbing cone 15.0/20.0
▪
Extension 20cm 3/4"
▪
Box nut 50 3/4" (for Cone screw B
7cm)
☞
Important note:
➤
Secure the Positioning template SCP to the
form-ply to ensure that the holes are accu-
rately positioned relative to each other.
A
Universal climbing cone 20.0 + Sealing sleeve K 20.0
C
Stop anchor 20.0
D
Depth mark
E
Cone screw B
7cm
H
Form-ply protector
32mm (width-across 70
mm)
98037-282-01
H
E
A
D
C
Where necessary, the Form-ply
protector
32mm can be closed off with a Cover
cap D35x3 (included with product).
98037-282-02
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...