Original Operating Instructions
Platform SCP
Start-up phases – Lifting unit attached on one side
141
999805802 - 03/2016
➤
Attach the crane suspension tackle to the Bracket
SCP.
➤
Engage the Bracket SCP in the Bracket SCP sus-
pension shoe.
➤
Bolt the fixing plate back on to the suspension shoe.
➤
Detach the crane suspension tackle from the
bracket.
➤
Install the brackets of the working platform in the
same way.
➤
Install bracings between the upper Brackets SCP.
Threaded-fastener material required
▪
1 Screw-set M24x65 10.9
Mounting the working platforms
➤
Attach the crane suspension tackle to the working
platform.
➤
Crane-lift the pre-assembled working platform and
guide it towards the upper brackets with the aid of
tag-lines.
➤
Pin the working platform to the Brackets SCP and
and secure the pins with Spring cotters 5mm.
A
Bracket SCP
E
Bracket SCP suspension shoe
A
Bracket SCP
E
Bracket SCP suspension shoe
F
Fixing plate
The Suspension shoes SCP are crane-lifted
together with the Brackets SCP.
98058-460-04
E
A
98058-460-01
E
A
F
WARNING
Risk of fracture if unsuitable bolts are used.
➤
Use only the Screw-set M24x65 10.9, in
every case.
➤
Use new screw-sets every time the equip-
ment is re-assembled.
➤
The bolted joints must comply with
EN
1090-2.
G
Bracing FRQ .....mm (project-specific)
H
Working platform
98058-460
-03
G
98058-461-06
H
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...