Start-up phases – Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Suspending the formwork from the
girder grille
➤
Guide the tie rod through the Element holder
SK
on
the formwork.
➤
Screw the tie rod into the roller unit / tie-rod holder,
and secure it with a locking plate.
There is ample working space between the
opened formwork panels with the formwork on
one side as roll-back formwork.
➤
Off-the-wall formwork elements must be
fixed on the scaffold, e.g. with a chain or a
quick-locking strap, to secure them against
accidental motion (dislocation or swinging).
A
Roll-back formwork
B
Holding formwork
98058-458-05
A
A
A
B
B
B
Close-up A: Roller unit SK (roll-back formwork)
Close-up B: With element suspender (holding formwork)
98058-422-02
C
D
98058-422-03
98058-422-04
C
E
F
98058-422-05
C
Element holder SK
D
Roller unit SK
E
Element suspender
SK
F
Tie-rod holder 15.0
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...