Original Operating Instructions
Platform SCP
Start-up phases – Lifting unit attached on one side
149
999805802 - 03/2016
➤
Secure Upper cylinder connector SCP to the girder
grill with clamping angles
M7.
➤
Use threaded rods to bolt the clamping angle M7 into
position.
Threaded-fastener material required for each Upper
cylinder connector SCP
▪
1 Screw-set M24x65 10.9
▪
4 threaded rods M24
(length 450 mm, strength grade 8.8)
▪
8 washers 24 (EN ISO 7089)
▪
8 hexagon nuts M24, strength grade 8
(EN ISO 4032 / DIN 934)
➤
Mount the Cylinder tube guides SCP on the bracing
of the vertical scaffold.
WARNING
Risk of fracture if unsuitable bolts are used.
➤
Use only the Screw-set M24x65 10.9, in
every case.
➤
Use new screw-sets every time the equip-
ment is re-assembled.
➤
The bolted joints must comply with
EN
1090-2.
C
Clamping angle M7
D
Grille-beam pair U300
98058-421-02
C
D
98058-421-05
E
Cylinder tube guide SCP
F
Bracing
98058-459-03
E
E
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...