Typical sequence of lifting-phases
– Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Typical sequence of lifting-phases
– Lifting unit attached on
one side
Instructions for safe resetting of the
entire unit
Note:
When combining lifting units attached on both sides
with lifting units attached on one side, follow the direc-
tions in the section headed 'Typical sequence of lifting-
phases
– Lifting unit attached on one side'.
Starting position
Starting position
▪
The entire lifting unit is anchored to the concrete by
the two upper brackets.
▪
The suspension shoe of the lower bracket is
anchored in the concrete, but the bracket is not rest-
ing on it.
▪
The previous section has been cast.
▪
All ties have been removed.
▪
The formwork has been rolled back as shown in the
final drawing or assembly drawing (by approx.
10
cm).
▪
Suspended off-the-wall formwork elements have
been fixed to the scaffold to secure them against
accidental motion (dislocation or swinging). E.g. by
chain or quick-locking strap.
▪
The only persons on the platform are trained crew-
members.
▪
The tilt-up trap-doors above the walls on the working
platform are closed.
▪
Hydraulic system is in full working order (cylinders,
hoses).
☞
Important note:
Before lifting:
Remove any loose items from
the formwork and platforms, or secure them
firmly.
CAUTION
➤
Max. wind speed for climbing operations:
72
km/h.
➤
Heed all storm warnings and take action as
necessary.
➤
Only begin climbing-operations that you can
be sure of finishing before wind speeds rise
too high.
➤
While the platform is being raised, the only
persons allowed on the platform are the
trained personnel in charge of the lifting
operation – i.e. the hydraulic-system opera-
tor and the watchmen.
98058-406-03
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...