156
999805802 - 03/2016
Typical sequence of lifting-phases
– Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Pulling up the lower bracket
➤
Press and hold down the 'Lower cylinder' button until
the brackets of the main working platform are seated
in the suspension shoes and the lower brackets are
lifted approx. 30 cm.
➤
Remove the cone screws from the lower suspension
shoes.
➤
Press and hold down the 'Lower cylinder' button until
the suspension shoes of the lower brackets are at
the same height as the new positioning points.
➤
Switch off the hydraulic unit.
The lifting operation is finished.
Combination of lifting units attached on both sides
and on one side
➤
Press the 'Lower cylinder' button for as long as nec-
essary until the latches of the Lower base beam
have automatically swivelled into the latch-boxes of
the new casting section.
➤
Move the suspension shoe of the lower bracket to
the same height as the new positioning points.
To do this operate the cylinders of the lifting units
attached on one side one at a time.
➤
Switch off the hydraulic unit.
The lifting operation is finished.
Mounting the Suspension shoe
➤
Align the suspension shoe with the positioning point.
➤
Fix the Bracket SCP suspension shoe to the Climb-
ing cones SCP with 2 Cone screws M36 SW50
9cm.
A tightening torque of 100
Nm
(20
kg, assuming a
ratchet-length of approx. 50
cm) is sufficient.
The travel path is free of obstacles.
98058-406-05
☞
Important note:
➤
Do not lower the lower base beam into the
concrete box-out.
The latches of the lower base beam remain free
of load.
▪
The Bracket SCP suspension shoe must be
secured with 2 Cone screws
M36
SW50
9cm.
▪
The Bracket SCP suspension shoe must be
flush against the concrete.
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...