16
999805802 - 03/2016
System description
Original Operating Instructions
Platform SCP
Two construction methods – one system
There are two basic modes of use, depending on the
site requirements and on the stipulated construction
method.
Core climbed ahead
In this method of construction, the core of the structure
(lift shafts, stairwells) climbs ahead of the slabs – this
separation of the structure‘s components accelerates
progress and offers excellent protection against
adverse weather conditions.
Slab and walls cast in one pour
In this construction method, the floor-slabs and walls
are cast in one single pour – this makes for high cost-
efficiency and speeds up construction progress still fur-
ther.
Core with surrounding slab
Core at structure edge
98058-404-01
Both methods allow slab zones inside the core
to be cast in one pour with the walls.
98058-402-01
98058-403-01
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...