Original Operating Instructions
Platform SCP
Operating the formwork
33
999805802 - 03/2016
Closing the formwork
➤
Clean the formwork and apply concrete release
agent.
➤
Press the holding formwork against the edge of the
structure and align it.
See the section headed 'Plumbing & aligning the
formwork'.
➤
Mount the Boxes for latch.
➤
Place the reinforcement.
➤
Release the position-holder (chain or quick-locking
strap) from the suspended formwork.
➤
Push the suspended formwork outward, to the top of
the previously cast section.
➤
Close the formwork and tie it.
This section only deals with how to operate the
formwork. For details of how to tie the formwork,
please see the User Information booklets
'Large-area formwork Top 50' or 'Framed form-
work Framax Xlife'.
A
Roll-back formwork
B
Holding formwork
▪
No persons are allowed anywhere between
the formwork and the reinforcement when
the position-holder is released.
▪
The Roller stops SK must be fitted and
secured.
98058-427-06
A
B
C
Roller stop SK
98058-427-07
C
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...