34
999805802 - 03/2016
Operating the formwork
Original Operating Instructions
Platform SCP
Opening the formwork
Preparations for lifting
➤
Undo the connections between the latch-boxes and
the formwork.
➤
Unscrew and remove the form-ties from the form-
work elements.
➤
Remove the formwork adjustment devices (props,
struts ...) or pivot them out of the way.
➤
Detach the formwork from the concrete.
After the lifting operation
➤
Push back the roll-back formwork as far as the stop.
D
Roller safety pin WS10
▪
The Roller safety pins WS10 must be fitted
and secured.
98058-427-01
D
CAUTION
➤
Off-the-wall formwork elements must be
fixed on the scaffold, e.g. with a chain or a
quick-locking strap, to secure them against
accidental motion (dislocation or swinging).
A
Roll-back formwork
B
Holding formwork
98058-427-02
A
B
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...