Original Operating Instructions
Platform SCP
Contents
Variable lifting units – one system
Two construction methods – one system
Schematic sequence of start-up phases
Platform SCP – Lifting unit attached on
both sides
Plumbing & aligning the formwork
Erecting the working platform and the
Suspending the formwork and platforms from
Mounting the hydraulic cylinders
Finishing the platform and enclosure
Typical sequence of lifting-phases
Assembling the vertical scaffold
Clamping-connections for assembling the
Mounting the Upper cylinder connector
Assembling the working platforms (Level 0)
Assembling the working platforms (Level +1)
Base beams for various shaft sizes
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...