1st casting section
➤
Mount the Boxes for latch.
➤
Apply concrete release agent and set up one side of
the formwork.
➤
Place the reinforcement.
➤
Set up the opposing formwork and place the ties.
➤
Pour the 1st section.
a ... 800
mm
b ... min. 700
mm
➤
Undo the form-ties.
➤
Remove the temporary platforms and pouring plat-
forms.
➤
Lift the inside formwork out of the shafts.
☞
In the 'Slab and walls cast in one pour' method,
a wall-plinth and a temporary support for the
formwork are needed.
A
Box for latch 15.0
B
Wall-plinth
C
Temporary support for formwork
D
Pouring platform
E
Temporary platform
98058-435-01
a
b
A
C
D
E
B
When used with the Framax stripping corner I,
the inside formwork can be lifted and reset in
one piece.
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...