Start-up phases
Original Operating Instructions
Platform SCP
Working platform with one base beam
Mounting the working platforms
➤
Position platform supports in the area of the multi-
purpose walings.
➤
Lift in the pre-assembled working platform as far as
the lower latch-boxes.
➤
Remove the Quick-locking strap 55cm from the top
latches.
➤
Set down the working platforms in the latch-boxes
and on the platform supports.
➤
Adjust the latch rolls.
a ... 10 mm
Erecting the vertical scaffold
➤
Lift the pre-assembled vertical scaffold into the upper
base beam.
➤
Pin each Vertical profile 150 into the base beam with
Fastening bolts FRQ150 and secure the bolts with
the cotter pins.
Included with the Vertical profile 150:
▪
4 Fastening bolts FRQ 150
▪
8 washers 21
▪
8 cotter pins 5x45
A
Platform supports (height = min. 950
mm)
B
Platform with one Upper base beam
Latch secured with
quick-locking strap
Pawl (lever-latch) is in "Box for
latch"
C
Upper latch
D
Quick-locking strap 55cm
E
Latch roll
98058-432-01
A
B
98058-430-02
D
C
a
98058-430-03
C
E
F
Upper base beam
G
Vertical profile 150
98058-434-01
98058-428-01
F
G
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...