Original Operating Instructions
Platform SCP
Start-up phases
51
999805802 - 03/2016
➤
Screw the star grip nut onto the tie rod and tighten it
until the element is suspended.
a > b
➤
Lock the Star grip nut 15.0 with a hexagon nut 15.0.
Fixing the tie rod in the roller unit
1)
Raise the locking plate.
2)
Screw the tie rod into the roller unit until it protrudes
by approx. 20
mm.
3)
Push the locking plate onto the tie rod.
This fixes the tie rod so that it cannot be turned.
c ... approx. 20
mm
Fixing the tie rod in the tie rod holder
1)
Raise the locking plate.
2)
Screw the tie rod into the Tie rod holder
15.0
until
it
protrudes by approx. 20
mm.
3)
Push the locking plate onto the tie rod.
This fixes the tie rod so that it cannot be turned.
c ... approx. 20
mm
☞
Important note:
➤
The excess length of the tie rod below the
star grip nut must be at least as large as the
clearance between the formwork and the
working platform.
A
Roller unit SK
B
Roller stop SK
C
Tie rod 15.0
D
Element holder SK
E
Star grip nut 15.0 G
98058-416-14
a
b
A
B
C
D
E
Max. load:
1300
kg per Roller unit SK
1000
kg per Roller unit WS10
Roller unit SK
Roller unit WS10
Max. load:
1300
kg per Tie rod holder 15.0
c
98071-266-11
3
1
2
98071-266-10
c
98071-304-02
3
1
2
98071-304-03
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...