54
999805802 - 03/2016
Start-up phases
Original Operating Instructions
Platform SCP
Mounting the hydraulic cylinders
➤
Attach the crane suspension tackle to the Upper cyl-
inder connector SCP.
➤
Lift the pre-mounted hydraulic cylinder into the shaft
(see final drawing or assembly drawing).
☞
Important note:
Note the installation position of the Upper cylin-
der connector SCP and the position of the
clamping angles M7!
A
Hydraulic cylinder SCP
B
Upper cylinder connector SCP
C
Clamping angle M7
98058-421-01
B
A
C
98058-416-08
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...