Original Operating Instructions
Platform SCP
Start-up phases
55
999805802 - 03/2016
➤
Secure Upper cylinder connector SCP to the girder
grill with clamping angles
M7.
➤
Use threaded rods to bolt the clamping angle M7 into
position.
Threaded-fastener material required for each Upper
cylinder connector SCP
▪
4 threaded rods M24
(length 450 mm, strength grade 8.8)
▪
8 washers 24 (EN ISO 7089)
▪
8 hexagon nuts M24, strength grade 8
(EN ISO 4032 / DIN 934)
➤
Mount the Cylinder head guide SCP on the upper
base beam.
WARNING
Risk of fracture if unsuitable bolts are used.
➤
Use only the Screw-set M24x65 10.9, in
every case.
➤
Use new screw-sets every time the equip-
ment is re-assembled.
➤
The bolted joints must comply with
EN
1090-2.
C
Clamping angle M7
D
Grille-beam pair U300
98058-421-02
C
D
98058-421-05
☞
Important note:
➤
The Cylinder head guide SCP has to be
mounted on the topside or the underside of
the base beam, depending on the height of
the casting section.
Cylinder head guide SCP
mounted on topside of base
beam
Cylinder head guide SCP
mounted on underside of base
beam
E
Upper base beam
F
Cylinder head guide SCP
Distance plates can be used for precision posi-
tioning of the cylinder head guide. The cylinder
head guide must be located at the bottom end
of the cylinder head.
F
Cylinder head guide SCP
G
Distance plates
98058-421-03
F
E
98058-421-04
F
E
98058-421-06
F
G
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...