Typical sequence of lifting-phases
Original Operating Instructions
Platform SCP
Starting position
➤
Do a sight-check before the lifting operation begins.
Raising the platform
➤
Press the 'Lift cylinder' button.
Platform travels upwards. The latches of the lower
base beam are resting in the recess in the concrete.
➤
Press the 'Lift cylinder' button for as long as neces-
sary until the latches of the upper base beam have
swivelled into the latch-boxes of the new casting sec-
tion.
➤
Press the 'Lower cylinder' button for as long as nec-
essary until the upper latches are resting in the latch-
boxes and the latches of the lower base beam are no
longer under load.
▪
The latches of the upper base beam are
resting in the recess in the concrete.
▪
The latches of the lower base beam have
been swivelled into the same recess in the
concrete but are not resting on it.
▪
The previous section has been cast.
▪
All ties have been removed.
▪
The travel path is free of obstacles.
▪
The formwork has been rolled back as
shown in the shop drawing / assembly plan
(by approx. 10
cm).
▪
Suspended off-the-wall formwork elements
have been fixed to the scaffold to secure
them against accidental motion (dislocation
or swinging), e.g. by chain or quick-locking
strap.
▪
The only persons on the platform are
trained crew-members.
▪
The tilt-up trap-doors above the walls on
the working platform are closed.
▪
The hydraulic system is in proper condition
(cylinders, hoses).
98058-409-01
☞
Important note:
Failure of a hydraulic cylinder during the lifting
operation causes the platform to deform.
➤
Watch out for the manometer indicator, and
act upon it.
➤
Stop the lifting operation if there are any
irregularities.
Do not continue to lift the platform until the fault
has been remedied.
98058-409-02
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...