84
999805802 - 03/2016
Pre-assembly
Original Operating Instructions
Platform SCP
Suspending formwork from multi-
purpose walings
Note:
Multi-purpose walings mounted to the girder grille make
it possible to position the roller units and element sus-
penders in a flexible way.
▪
Roller unit SK
- for suspending the roll-back formwork
▪
Element suspender
SK
- for suspending the holding formwork
Clamping-connection between Multi-purpose
waling WS10 Top50 and Grille beam U300
➤
Clamp the Multi-purpose waling WS10 Top50 to the
Grille beams U300.
Threaded-fastener material required
▪
2 threaded rods M16
(length 450 mm, strength grade 8.8)
▪
4 washers 16 (EN ISO 7089)
▪
4 hexagon nuts M16, strength grade 8
(EN ISO 4032 / DIN 934)
Clamping-connection between 2
Multi-
purpose walings WS10 Top50
Threaded-fastener material required for each connec-
tion
▪
1 threaded rod M16x250
▪
1 washer 16
▪
1 hexagon nut M16
A
Grille beam U300
B
Multi-purpose waling WS10 Top50
☞
Make sure that the connection plates are in the
right position!
98058-447-01
A
B
A
Grille beam U300
B
Multi-purpose waling WS10
Top50
C
Double fixing plate WS10 H
D
Head fixing plate SK
B
Multi-purpose waling WS10
Top50
E
Bolting plate SK
F
Clamping plate SK
98058-422-13
A
D
C
B
98058-447-06
B
B
E
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...