Original Operating Instructions
Platform SCP
Start-up phases
41
999805802 - 03/2016
Erecting the working platform and the formwork
Note:
When combining lifting units attached on both sides
with lifting units attached on one side, the working plat-
forms must be mounted at the same height as the
brackets.
Positioning the lower base beams
➤
Attach the lifting chain to the pre-assembled base
beam.
➤
Position the pre-assembled base beams in the latch-
boxes.
➤
Remove the Quick-locking strap 55cm from the
latches.
➤
Set down the base beams in the latch-boxes.
➤
Detach the lifting chain from the base beam.
➤
Put up service towers on the outsides.
A
Lower base beam
98058-430-07
A
Latch secured with
quick-locking strap
Latch in latch-box
B
Quick-locking strap 55cm
C
Lower latch
The latches of the base beams must be rest-
ing in the middle of the latch-boxes.
98058-430-04
B
C
98058-430-05
C
98058-416-16
D
Working platform with one base beam
E
Working platform with no base beams (suspended platform)
F
Working platform with two base beams
98058-432-03
D
F
E
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...