Original Operating Instructions
Platform SCP
Pre-assembly
87
999805802 - 03/2016
Assembling the working platforms (Level 0)
Working platform with two base
beams
➤
Lay the base beams spaced at the correct centre-to-
centre distance on hardwood blocking.
➤
Bolt Custom profiles U200 to the base beams.
a ... centre-to-centre distance
x = y ... diagonals
Threaded-fastener material required for each custom
profile
▪
4 hexagon bolts M20x60, strength grade 8.8
(EN ISO 4017 / DIN 933)
▪
4 washers 20 (EN ISO 7089)
▪
4 hexagon nuts M20, strength grade 8
(EN ISO 4032 / DIN 934)
➤
Bolt Latch rolls to the ends of the Custom profiles
U200.
Threaded-fastener material required for each latch roll
▪
4 hexagon bolts M20x60, strength grade 8.8
(EN ISO 4017 / DIN 933)
▪
4 washers 20 (EN ISO 7089)
▪
4 hexagon nuts M20, strength grade 8
(EN ISO 4032 / DIN 934)
➤
Adjust the Latch roll (for dimension 'a' see final draw-
ing or assembly drawing).
Note:
To fasten the Doka beams H20 onto the base beams,
a longer hexagon bolt is needed for the Beam screws
S8/70!
➤
Bolt Doka beams to the base beams with 'Beam
screws'.
A
Upper base beam
B
Custom profile U200
C
Hardwood blocking (height min. 150
mm)
98058-443-06
A
B
C
x
y
a
98058-443-07
A
B
C
B
Custom profile U200
D
Latch roll
A
Upper base beam
E
Beam screw S8/70
(longer hexagon bolt necessary)
F
Doka beam H20
98058-443-05
B
D
98058-443-04
a
98058-443-03
A
E
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...