Original Operating Instructions
Platform SCP
Pre-assembly
93
999805802 - 03/2016
Assembling the working platforms (Level +1)
➤
Place Doka H20 beams on a level floor.
➤
Fasten platform decking to the Doka beams with suf-
ficient numbers of universal countersunk screws
6x80.
Manhole
➤
Cut out the opening for the manhole.
a ... 710 mm
b ... 610 mm
➤
Screw the Manhole B 70/60cm onto the platform
decking with universal countersunk screws 5x40.
A
Doka beam H20
B
Platform decking (Raw sheet 3-S 38mm)
98058-450-01
A
B
C
Manhole B 70/60cm
98058-450-03
b
a
98058-450-02
C
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...