Original Operating Instructions
Platform SCP
Dismantling
97
999805802 - 03/2016
Dismantling
Dismounting the working
platform
'+1'
➤
Mount temporary platforms (site-provided).
➤
Open the flaps between the platform elements.
➤
Attach the lifting chain to the platform element.
➤
Dismount the Beam clamp U300 double from the
platform element that has been attached to the
crane.
➤
Lift the working platform off the girder grille
and
set
it
down.
☞
Important note:
▪
A hard, flat, firm surface is needed!
▪
Provide a sufficiently large dismantling
space.
☞
Important note:
▪
Before lifting:
Remove any loose items
from the formwork and platforms, or secure
them firmly.
▪
"Passenger transportation" is forbidden!
▪
Exposed fall-hazard locations must be
closed off by
attaching side railings
.
▪
During all assembly and dismantling work on
the Platform
SCP that is carried out on the
structure itself, the operators must use fall-
arrest equipment (e.g. the Doka personal
fall-arrest set).
A
Grille beam U300
B
Doka beam H20
C
Beam clamp U300 double
D
Universal countersunk screws 5x50
98058-417-01
B
A
D
C
E
Working platform
F
Temporary platform
98058-416-21
E
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...