User Information
Ringlock
Erection Guidelines for 10 Leg Stair Tower
67
999817902 - 10/2022
Step 7
The third landing can be assembled by the next con-
secutive steps:
➤
Place the 3.0m Standards.
➤
Assemble the Ledgers.
➤
Assemble the Bay Braces at the two outer sides.
➤
Assemble the Stringers.
➤
Assemble the Treads from bottom to top.
➤
Assemble the Planks on the next landing.
Step 8
➤
The Stair Tower is complete after the assembly of
1m Standards on the third landing, Guardrails (Using
Ledgers) along the stair and on the third landing, and
Toeboards on the third landing.
The tower is now complete up to the third lift.
➤
Continue with is method until the full height of the
Stair tower is reached.
For notes on dismantling the Ringlock Stair Tower refer
to 'Guide to Dismantling Ringlock Scaffolds'.
98179-232-01
98179-233-01