User Information
Load-bearing tower Staxo
100
eco
Assembly
25
999808702 - 11/2019
Horizontal assembly
Preliminary remark:
▪
The terms 'vertical' and 'horizontal' (e.g. referring to
the diagonal crosses) are always used here with ref-
erence to their installation situation in the finished,
upright tower.
▪
The job of erecting the load-bearing tower begins
with the bottom (i.e. first) 'storey'.
General:
▪
The gravity latches of the frame must always point
upwards.
▪
Slide the diagonal cross onto the safety-catch bolt
and immediately secure it with the safety catch.
Erecting the first storey
➤
Having regard to the instructions given above, place
the tower frames on their sides on timber supports
(min. 4cm high).
Bracing the frames in the vertical
➤
Link the frames with diagonal crosses.
Plan-bracing the frames (in the horizontal)
➤
Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
➤
Push in and secure the base units. See the section
headed "Lifting by crane".
F
Diagonal cross
9758-226-01
✗
✔
98087-219-06
98087-219-01
F
F
Basic rule:
▪
Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
D
Frame
K
Diagonal cross
98087-219-02
K
D