Assembly
User Information
Load-bearing tower Staxo
100
eco
Erecting further storeys
Note:
Do not pre-assemble units any higher than 10 m.
➤
Insert the couplers into the frames that you are about
to add, and secure them with Spring locked connect-
ing pins 16mm.
➤
Add the next frame and connect it to the frame below
with Spring locked connecting pins 16
mm.
➤
Fit and secure diagonal crosses in the same way as
in the first 'storey'.
h ... max. 10
m
➤
Install scaffold planking units where needed.
➤
Close the anti-liftout guard.
L
Coupler
F
Diagonal cross
98087-219-04
L
98087-219-05
98087-219-03
F
F
F
h
Having scaffold planking units in the top "sto-
rey" makes it easier to carry out assembly
work on the towerframe superstructure.