User Information
Load-bearing tower Staxo
100
eco
Assembly
29
999808702 - 11/2019
Erecting the second storey
Stacking the frames
➤
Place scaffold planking on the finished 'storey'.
➤
Close the anti-liftout guard.
➤
Insert the couplers into the frames that you are about
to add, and secure them with Spring locked connect-
ing pins 16mm.
➤
Add the next frame and connect it to the frame below
with Spring locked connecting pins 16
mm.
Bracing the frames in the vertical
➤
Fit and secure diagonal crosses in the same way as
in the first 'storey'.
G
Scaffold planking
L
Coupler
Tr842-200-01
98087-217-02
L
G
F
Diagonal cross
98087-217-03
F