Assembly
User Information
Load-bearing tower Staxo
100
eco
Erecting the third 'storey'
➤
Raise the scaffold planking units to the next level.
➤
Add 1.20
m frames in the same way as for the 2nd
storey.
➤
Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
➤
Place the scaffold planking units 1 storey higher up.
➤
Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
Plan-bracing the frames (in the horizontal)
Erecting further storeys
➤
Add further frames in the same way as for the 3rd
storey, and brace them in the vertical with diagonal
crosses.
F
Diagonal cross
98087-217-04
F
Basic rule:
▪
Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
NOTICE
▪
If the load-bearing tower is over 6
m high,
back-stay it or combine it with other towers.