Repositioning
User Information
Load-bearing tower Staxo
100
eco
Link the frames in a crane-handling-safe
manner
➤
Check whether all Spring-locked connecting pins
16mm have been fixed into place.
Repositioning operation
➤
Working from the service tower, for example, attach
the crane sling to the Lifting rods 15.0 and lift the
tableform to its next location. Spread angle β max.
30°.
Shifting the table in skeleton construction
➤
Take the load off the table by turning the threaded
spindles.
➤
Clamp on the wheel-units.
➤
Push in and secure the base units.
➤
Using the wheel-units, lower the table, and wheel it
out as far as the stop.
➤
Remove the front wheel-units.
➤
Screw the Lifting rod 15.0 into the previously
mounted Retaining plate 15.0.
➤
Attach the crane sling to the Lifting rod 15.0, then
raise the crane until the front legs are just off the
floor.
➤
Push the table outwards until only the innermost legs
are still over the floor.
➤
Mount more lifting rods and attach crane slings.
➤
Use a chain hoist to shorten the rear cables until the
table is suspended in the horizontal.
➤
Manoeuvre the table all the way out with the crane,
then lift it to the next storey.
B
Spring-locked connecting pin 16mm
While the tableform is being lifted, there must
NOT be any loose parts, tools or other items
on the tableform!