Assembling towers in the upright
User Information
Load-bearing tower Staxo 100
Erecting the third 'storey'
Stacking the frames
➤
Add 1.20
m frames in the same way as for the 2nd
section.
➤
Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
Mounting scaffold planking units and bracing
the frames in the vertical
➤
Place scaffold planking on the finished 'storey'.
➤
Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
Horizontal bracing
➤
Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
G
Scaffold planking
F
Diagonal cross
98003-264-01
F
G
98003-261-01
NOTICE
If no scaffold planking units are used, or if
these are removed before the tower is finally
put into use, the following rule applies:
Basic rule:
▪
Maintaining correct geometry by fixing a horizontal
diagonal cross in the 1st and last-but-one or last
'storey', and every 10
m.
Additionally as required e.g.
- if there is a horizontal restraint for the tower
(even a temporary one)
- if local loads need to be transferred (e.g. from
attaching the tower to the crane after it has
been ground-assembled in the horizontal)
For detailed design-load information, see the type
test.
K
Diagonal cross
98003-285-01
K