DB620 / DB 625
|
Dolphin
|
7
INSTALLATION
Step 2 – Preparation For Installation
1. Shut off the water supply
2. Cut an adequate opening in the wall for the
dimensions of the front fixation PVC pipe.
1. Insert the PVC pipe through the opening
2. Once the construction works have been
completed, cut the PVC pipe to the desired
length.
3. Place the sensor in the PVC pipe and tighten
the two Allen screws provided. Important: Make
sure to place the solenoid valve and housing as
well as the power source in an accessible
location such as under the sink or in the ceiling.
4. Connect the water outlet to the
solenoid valve housing.
Step 3 – Installing the system