Dear Customer,
Thank you for selecting our product. We are confident that the quality of our wide
range of technologically advanced products will meet your every expectation, as they
are result of years of experience in the field of taps and fittings. Our products also
comply with international standards of many standardization bodies, which has led us
to obtain ISO 9002 certification on company quality. For the most efficient use of our
product, we recommend that you read the following instructions with care.
The Menagement
Composition (fig. A)
1.
plate
9.
shunt
2.
indicator ring
10. aerator
3.
screw
11. stud bolt
4.
handle
12. O-ring
5.
closing mechanism
13. shaped seal
6.
body
14. flange
7.
fitting
15. stay
8.
O-ring
16. supply tubes
Supply Recommended
Maximum
Minimum
Hot water temperature
65º
80º
15º
Working pressure
3 BAR
5 BAR
0.5 BAR
If working pressure is over 5 BAR, we recommend using a pressure reducer. This
tap is not compatible with the use of low-pressure instantaneous hot water heaters.
Tools required:
- Adjustable pliers
- Screwdriver
- Control wrench
- Teflon
Before starting assembly operations, bleed the pipes of hot and cold water to pre-
vent dirt or other impurities from affecting the operation of the tap.
Important: the hot water must be connected to the left pipe, the cold water to
the right pipe.
TIPS ON INSTALLATION:
TECHNICAL INFORMATION:
14
Summary of Contents for AD58
Page 3: ...3 Fig A ...
Page 4: ...4 Fig D Fig C Fig B ...
Page 30: ...30 Fig E Fig F Fig G ...
Page 31: ...31 Fig H Fig I ...
Page 32: ...Date d achat Cachet du magasin TRCC106IST VPC0807041636 ...