12
Installation
4.1.3 Gas connection
n
The correct connection of the fridge has to
be carried out by a skilled specialist.
n
Note the particularly valid national rules for
usage of LG-driven appliances.
- Technical Standards EN 732
n
A preset pressure regulator
(1)
, Fig. 3, has
to be installed within the supplying line to
the fridge. The fridge must not be operated
with any other pressure than the one indica-
ted on the rating label.
n
The fridge has to be connected to the gas
bottle with a security hose.
n
Choose a sufficient length to connect the
hose pipe without kinks. The hose must not
be longer than 1.5 m.
n
The gas connection to the appliance is
effected by means of a suitable coupling
tube fitting L8, complying with EN 1949 (e.
g. Ermeto).
n
The hose has to be replaced within the
intervals settled in the particular national
rules.
n
After having connected the gas bottle, a
leak test at all joints and a burner flame test
have to be carried out. Use a leak indicating
spray or a foaming agent carrying out the
leak test. After having opened the bottle
valve check the joints for bubbles.
1
Bottle valve
Fig. 4
Fig. 3
Fig. 5
Fig. 6
SG 14
SG 17
Detail
2
. Adjust door handle
at the door and
screw onto it.
1
. Fixing points:
use true-to-scale
template (1)
(see
"Annex")
3
. Attach cover and fix by pushing.
4.2
Assembling the doorgrip
1
Never use a naked flame to check the
appliance for leaks.
DANGER !
The refrigerator should only be operated using
liquid gas (propane, butane).
Do not use town gas or natural gas!
Template
1
Ø 2mm
max
1.1 Nm!
289 0317-60_2_EN_RGE3000_N1_Layout 1 25.06.2013 12:52 Seite 12