(Bulletin R55/7A continued)
INSTALL REPLACEMENT COOLING UNIT:
1.
2.
3.
4.
5.
6.
7.
Trim the Styrofoam portion of the cooling
unit if it does not go freely into the
refrigerator.
Apply sealing permagum (sealing tape) on
mounting plate (A; FIG. A4).
Apply thermal mastic
on
the evaporator coil
(B; FIG. A4).
Tighten screws securely to obtain proper
c o n t a c t b e t w e e n t h e e v a p o r a t o r c o i l a n d
evaporator flange; otherwise improper cabinet
performance may result.
Install the heating element completely back
into the pocket and plug in.
Reconnect burner assembly to chimney.
Reinstall capillary tube into proper position
(FIG. A3).
FIG.
A4
B. Category #2
RM100 RM763 RM1303
RM760 RM1300 RM2600
RM3600
RM76
1
RM1301 RM2800
RM3800
REMOVAL OF COOLING UNIT:
1.
2.
3.
Remove screw holding clamp for capillary
tube. Pull capillary tube out gently and
place aside (FIG. Bl).
a. RM3600, RM3800 (FIG. B4)
Remove heater(s) from boiler case (FIG. Bl).
Disconnect burner from chimney (FIG. B2
and B3).
a. RM2600, RM2800, RM3600, RM3800
(FIG. B3).
D-9-5
4. Remove evaporator screws (FIG. B4).
5. Remove screws holding unit from rear (FIG.
Bl).
6. Cut tape holding plate (FIG. B1).
7. Apply leverage as shown and pull unit out
(FIG. B
).
5
6
WOOD BLOCK
FIG.
B3
FIG. 84
INSTALL REPLACEMENT COOLING UNIT:
1. Trim the Styrofoam portion of the cooling
u n i t i f it does not go freely into the
refrigerator.
Manual
Compliments
of
Northwest
RV
Supply
Printed
From
http://www.nwrvsupply.com