14
ELECTRIC EQUIPMENT
HEATERS
The heat necessary for the operation of an absorption
cooling unit is supplied by an electric heater mounted in
a pocket of the boiler system.
This model is equipped with a series connected twin
heater.
To replace the heater proceed as follows:
1. Disconnect the wall plug, and the 12 volt wires.
2. Remove the protection cover see FIG. 1
3. Remove the power module cover see FIG. 1
4. Disconnect the heater leads.
5. With a pair of pliers unfold the lug holding the lid
of the boiler casing and open the lid.
6. Remove some insulation wool so that the heater
is accessible.
7. Turn and lift the heater out of its pocket.
8. Fit the new heater into the pocket.
9. Connect the leads and put on the power module
cover.
10. Reset the insulation and close the lid of the boiler.
11. Replace the protection cover.
FUSES
See wiring diagram
DISCONNECT 120 V AC AND 12 V DC POWER
BEFORE SERVICING
To replace fuses proceed as follows.
1. Disconnect the wall plug, and the 12 volt wires.
2. Remove the power module cover. See FIG. 1.
3. Snap the fuse out of the fuse holder.
4. Fit a new fuse in to the fuse holder.
5. Replace the power module cover.
! WARNING