CM20018
HARNESS
CABLE TIE
GATEWAY HARNESS
PART NO. CM20018
CABLE TIE
6-7
EN
Figure 6-8. Harness connection to EST gateway.
Optimus EST gateway connection
Connect the two large connectors on the CM20018 harness to the gateway
and tighten the screws to secure them. Use cable ties to secure the harness
cables to the strain relief plate as shown in figure 6-8.
Optimus CAN1 and CAN2 connections
The CM20018 harness has a CAN1 and a CAN2 connector. Connect these
to the networks as shown in section 3. To make the CAN1 connection you
may require the CM21702 wye harness shown in figure 6-2 and figure 6-3.
The wye harness converts one CAN1 port into two.
Optimus PCM ignition sensing
There are two purple ignition sensing wires on the PCM harness
CM20304. You need to connect both these wires to ensure that damage
to one ignition wire does not cause the steering to shut down.
6.2.3
6.2.4
6.2.5
NOTICE!
If you are retrofitting an existing EPS installation these ignition sensing wires
will have already been connected to the ignition key switch. Remove these
connections and make the connections outlined below.
Summary of Contents for OPTIMUS 360
Page 10: ...1 4 EN This page left intentionally blank ...
Page 12: ...2 2 EN This page left intentionally blank ...
Page 22: ...4 4 EN This page left intentionally blank ...
Page 38: ...6 14 EN This page left intentionally blank ...
Page 70: ...9 8 EN This page left intentionally blank ...
Page 78: ...10 8 EN This page left intentionally blank ...
Page 80: ...11 2 EN ...
Page 82: ...12 2 EN This page left intentionally blank ...
Page 84: ...A 2 EN This page left intentionally blank ...
Page 86: ...A 2 EN This page left intentionally blank ...
Page 88: ...A 4 EN This page left intentionally blank ...
Page 115: ......