7-17
EN
Figure 7-18.
Before configuring the EST gateway you should have already conducted
the initial system setup described in section 4.
If you have more than one control station you will need to configure each
gateway separately, as they need to be calibrated to their adjacent remote
control. The calibration wizard records the output values from the remote
control’s lever position sensors (LPS) at various lever positions.
The gateway calibration is performed easily with the CANtrak display.
Procedure
1.
The gateway calibration must be performed with the engines keyed
on, but not running. Check the RPM reading on the color CANtrak and
the Yamaha display. Both should read 0 RPM at all engines. If the RPM
displays as ‘---‘ on the CANtrak, check your speed source connections.
2.
At the main station CANtrak, navigate to
Dealer Menu > Initial
Setup > EST Gateway
to bring up the EST Gateway Setup screen.
If you have two gateways, and have correctly set the number of
gateways in section 4, then you will also see a 2nd station gateway
on your screen.
7.3 Yamaha EST gateway setup
3.
Select
Calibrate Main EST Gateway
and press
>
. This will put the
main station gateway into calibration mode.
Summary of Contents for OPTIMUS 360
Page 10: ...1 4 EN This page left intentionally blank ...
Page 12: ...2 2 EN This page left intentionally blank ...
Page 22: ...4 4 EN This page left intentionally blank ...
Page 38: ...6 14 EN This page left intentionally blank ...
Page 70: ...9 8 EN This page left intentionally blank ...
Page 78: ...10 8 EN This page left intentionally blank ...
Page 80: ...11 2 EN ...
Page 82: ...12 2 EN This page left intentionally blank ...
Page 84: ...A 2 EN This page left intentionally blank ...
Page 86: ...A 2 EN This page left intentionally blank ...
Page 88: ...A 4 EN This page left intentionally blank ...
Page 115: ......