Evolution EV HAM
8
4.3
Combustion products exhaustion and air intake dual-duct device ø80 (typr C
53
)
For this type of boiler, the removal of combustion products and air intake take place through
separate Ø80 mm. dual ducts. The Ø80 dual duct outlet kit, code CGAS000186, is used for this
purpose. This is the type of fume removal provided for
Evolution
boilers by default.
The
maximum length
of pipe that can be installed is 15 metres for the model EV 35 HAM and 17
meters for the model EV 25 HAM, which is the result from adding the pipe metres for the air intake
and those of the combustion products exhaustion. Each elbow of 90°, or two of 45°, reduces the
available length by 1 meter and each horizontal meter is equivalent to 2 vertical meters.
It is recommended that the exhaustion duct be fitted in a slightly upwardly-inclined direction, at
around 2º - 3º, thus preventing any water and condensation from dripping out.
Dual-duct ou tlet K it
∅
80/100 in ox
Cod. CGAS000 265
1m. du ct
∅
80 in ox. Co d. CGAS000145
1m. duct
∅
100 inox. Cod. CGAS000 268
1 m. du ct
∅
100 PP Co d. CGAS0 00355
90º elbo w
∅
80 in ox Co d. CGAS0 00147
90º elbow
∅
100 inox Cod. CGAS000267
90º elbow
∅
100 P P Cod. CGAS000358
45 º elbow
∅
80 in ox. Cod. CGAS000148
45º elbo w
∅
100 in ox. Co d. CGAS000266
45º elbow
∅
100 P P Cod. CGAS000357
Examples of installation:
Summary of Contents for EVOLUTION EV 25 HAM
Page 1: ...INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION EV HAM ...
Page 42: ...Evolution EV HAM 40 NOTAS ...
Page 43: ......