INSTALLATION, USE AND MAINTENANCE
GBA-GBP-CBE-MBE SERIES
25
4 HANDLING - INSTALLATION - COMMISSIONING
4.1 General notes for delivery
•
The manually/electric rotated jib cranes of the GBA-CBE pillar-mounted version
and the GBP-MBE wall-mounted version, are delivered not assembled, in their
main parts which are the pillar or bracket, the arm, the electric system and, when
part of the supply, the lifting unit.
•
The user must therefore proceed to the phases of installation of the jib crane
following the instructions contained in this chapter and assigning if possible
the assembly to specialised installers.
•
Due to their delicacy and importance, the operations described in this chapter
if not performed correctly may result in serious risks for the safety and health
of exposed persons during the installation and use phases of the jib crane.
•
Therefore, they must be performed by professionally qualified personnel with a
specialisation in assembling industrial plants, with an electromechanical
background, equipped with work equipment and personal protection equipment
in compliance with current laws on occupational safety and after having
carefully read this publication.
After receiving the supply check and make sure that:
1. The shipping data (address of the recipient, no. of parcels, etc.) match what is contained in the
accompanying documentation (transport document and/or any packing list).
2. The technical/legal documentation supplied with the jib crane includes:
•
the “User instructions” manual of the crane to install.
•
CE Declaration of Conformity.
•
Test logbook, when included.
•
instructions for using the hoist / trolley to install on the crane, if they are part of the supply.
3. The packaging, if part of the supply, is in good condition, intact, and free from damage.
In the event of damage or missing parts report the problem to the shipper, putting a
written reservation on the accompanying document and notifying the manufacturer
within eight days from receiving the goods.