INSTALLATION, USE AND MAINTENANCE
GBA-GBP-CBE-MBE SERIES
33
fig. 27
fig. 28
fig. 29
fig. 30
fig. 31
fig. 32
fig. 33
fig. 34
After the first lifting operations it is advisable to check nut tightening again, to take
up any play due to settlement of the plinth.
Donati Sollevamenti SRL shall not be held liable for any fixings other than those
indicated in fig. 29 and fig. 30.
4.3.4 GBP
– MBE: Assembly of the bracket (stir-ups, bracket)
The fixing of the bracket to the support structure can take place as follows:
•
using brackets with the related staybolts.
•
using bolts and screw anchors or dowelling.