INSTALLATION, USE AND MAINTENANCE
GBA-GBP-CBE-MBE SERIES
74
7 SPARE PARTS
•
The jib cranes have been designed so they do not normally need spare parts due to
FAULTS OR BREAKAGE, if they are used correctly and following adequate
maintenance as described in this manual.
•
If necessary, consult the “Jib crane components and spare parts” manual.
•
Parts or components subject to normal wear and tear following use can be
obtained from the manufacturer for a minimum period of 10 years.
•
Do not hesitate to replace the part and/or component in question, if it is not able
to offer sufficient guarantees on its safety and/or functional reliability.
•
Do not ever make temporary or makeshift repairs!
When it is necessary to replace faulty parts, it is mandatory to only use original spare parts, by contacting
the manufacturer directly.
DONATI SOLLEVAMENTI S.r.l.
Via Quasimodo, 17 - 20025 Legnano (MI)
Tel. +39 0331 14811 - Fax +39 0331 1481880
E-mail: dvo.
The use of non-original spare parts, in addition to cancelling the warranty, may
compromise the correct operation of the jig crane and/or its components.
8 CONTROL BOOKLET
To demonstrate the correct performance of all of the test and maintenance activities of the jib crane, as
well as to keep a record of all responsibilities in terms of the performed activities, as described in this
publication,
it is advisable to diligently fill in and maintain for the expected life of the hoist
(10 years)
the specific control booklet as prescribed by RES 4.4.2 of Annex I to the Machinery Directive 2006/42/EC
supplied, when required, as an attachment to this publication.
In addition to the activities regarding the life and the use of the jib crane (replacement of parts, overhauls,
faults of a certain entity, etc.) all operations included in the maintenance plan with quarterly and annual
frequency indicated in the
“Table of periodic checking and maintenance operations”,
paragraph 6.3.2
must be noted in the control booklet.
The maintenance personnel assigned by the customer are responsible for filling in all parts of this logbook
reporting the results and any notes in the specific spaces.
The name of the maintenance personnel and the date of the intervention must be clearly identified.